Scientific Surveys Ltd The Premiere Pipeline Portal
SSL HomeAbout SSLSSL LinksContact UsFeedback SSL Store
 
PipemagPipedirPigsourceWorldpipePipeconferences
Home
Search
Start here, you'll be able to search products by Title, Publication Date, Keywords, or browse by Category.
Continue
Keep items in your cart, continue shopping
Checkout
Click here when you're done buying.
An account is required to use ssl's secure commerce engine
Once created, you may proceed to either modify your account or continue to purchase items.
View Cart
Check the items you've put in your cart for purchase.
Order Status
Find out where your order is.
 

 

Displaying records 191 through 191 of 2180
First Prior Next Last
   
Qty:  Add to Cart
Special! Free shipping on this item!
Title: An ICDA case study: a 43-year-old sour gas pipeline
Category: Technical papers from the Journal of Pipeline Engineering
Downloadable: Yes 
Catalog No.: 2143s
Date of Publication: Sep 1 2008 12:00AM
Price: $25.00 US
Authors: Theo Abels and Nguyen Bich
Abstract: THIS PAPER discusses a 42-km long, 14-in diameter, pipeline that was built and commissioned in 1962, and is the primary source of sour gas to a sour gas processing plant. The pipeline has operated as a dehydrated sour gas/condensate pipeline, and was assessed as a candidate for an internal corrosion direct assessment (ICDA). This analysis came with the challenge of a lack of operational and inspection history. The decision was made to obtain as much history as possible by interviewing previous operators, and to perform an ICDA analysis based on this information.

The ICDA analysis, performed by a technical specialist utilizing wet sour gas corrosion methodology and ICDA (critical angle) technology, was undertaken for one ICDA region. Nine assessment cases were identified as the operating criteria changed with time, and each was assessed. On occasion the gas specifications had criteria below the minimum levels of influence, and an analysis was also performed with these adjusted to force identification of potential internal corrosion locations.

The results were presented identifying two locations of potential long-term corrosion, and one location susceptible to corrosion post-2000. Following a review of the ICDA analysis, it was felt that there was sufficient confidence to proceed with the direct assessments, and the decision was taken to expose the three identified locations.

Direct assessment at all three locations was performed using guided-wave UT as the initial anomaly detector, and phased-array UT was then utilized to confirm any anomalies, and was run along the bottom of the exposed line to confirm no anomalies were excluded. The results of the NDE indicated no anomalies of more than 10%, and it was concluded that no significant internal corrosion of concern exists.

The final phase of the ICDA (post-assessment) concluded that the analysis was successful and that the ICDA project was a success. The reassessment intervals will be driven by any future changes in the transported product, and information obtained from on-line corrosion monitoring.

References

1. Olivier Mosghissi et al., 2002. Internal corrosion direct assessment of gas transmission pipelines. Paper 02087, Corrosion/2002, NACE International, Houston, Texas.
2. CorrCana Technology: proprietary corrosion-assessment software.
3. Nguyen N.Bich and Ed Heaver, 2003. Assessment and control of topside/riser/pipeline corrosion of a subsea gas re-injection system. Paper 03637, Corrosion, NACE International, Houston, Texas.
4. Nguyen N.Bich, 2002. An approach to corrosion mitigation for wet-gas pipelines. Paper 27417, Proc. 4th International Pipeline Conference, Calgary, Canada, 29 September –3 October.
5. NACE, 2002. Standard RP0502-2002: Pipeline external corrosion direct assessment methodology. NACE International, Houston, Texas.

SSL Home Copyright | Privacy Statement